Welcome to Dongguan Aoguan Instrument Co., Ltd!2852596-301

How to install the machine correctly? The machine parameters may be incorrect during transportation or operation

Date:2019/8/29 1843 times Size:Large medium Small

Power supply conditions:

Please configure the correct power supply according to the name plate of the machine

The error range of input voltage should be within ± 10%, and the machine should be correctly grounded to prevent damage caused by electric leakage.


Installation requirements:

1. There is no strong vibration source and strong electromagnetic field around

2. It should be placed in a stable and horizontal position without serious dust and direct sunlight

3. Machine installation space: at least 50cm at the back, 30cm at the side and 100cm at the front

4. Operating environment requirements: room temperature (ambient temperature 5 ~ 40 ℃, relative humidity no more than 85%)


How to adjust the machine parameters that may be incorrect during transportation or operation?

Please call us at + 86 13794832878


Previous:No more
Next:Brief introduction of the use method of personnel safety inspection instrument
Return to list

SERVICE HOTLINE:

13826941421

08:00 - 20:00, Monday To Friday

24-hour online consultation

Dongguan Aoguan Instrument Co., Ltd
Tel:+86 0769-22773260    Mobile:13826941421(wechat)
ATTN:Mr Hu     Email:yuz.machine@163.com
Address:Room 101, Building 3, Xiangsheng Industrial Park, No. 19, Jianshe Road, Gaopu Town, Dongguan City
Copyright © GCI All Rights Reserved.

Pay attention to wechat

Browse mobile site